The concrete pad is not shown, as this is a show building.
Upon your order we will supply building instructrions and drawings.
The concrete floor (concrete floor not always needed) and foundations can be poured in one hit.
The concrete floor is left plain and the foundation bolts are installed once the building is up.
The side sheets are designed to run 25mm past the concrete floor level to ensure a rain-proof seal.
We offer a delivery service to suit your access requirements and at a time to suit your daily schedule.
.
|